ProjectLoad Blog

10/29/2005

New Drill-Down for Work Hours Reports

Filed under: — Jonny Roller @ 10:57 am

For each “Work Hours” report, drill-downs into the column level (e.g. year, month or week) are now supported. The year, month or week listed in the report heading is now a link. Just click on one of these links to open a new report window that displays the underlying monthly or daily data.

Comments »

The URI to TrackBack this entry is: http://blog.projectload.com/archives/2005/10/29/new-drill-down-for-work-hours-reports/trackback/

No comments yet.

RSS feed for comments on this post.

Leave a comment

Line and paragraph breaks automatic, e-mail address never displayed, HTML allowed: <a href="" title="" rel=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>

(required)

(required)


Protected by WP-Hashcash.

Powered by WordPress