ProjectLoad Blog

1/31/2006

Subtotals Now Available in Work Hour Reports

Filed under: — Jonny Roller @ 6:10 am

All work hour reports now include the capability to sort the results and produce subtotals. This can be exceptionally useful to create reports that show information at two different levels at once. For example, the Phase level report can be set to produce subtotals by project thus showing the work hours by project as well as the work hours for each phase within the project. The activity report can display the work hours for each person as a sub total and the individual activities each person worked on as the detail. The subtotal options can be recorded as customized reports and reproduced as needed.

Comments »

The URI to TrackBack this entry is: http://blog.projectload.com/archives/2006/01/31/subtotals-now-available-in-work-hour-reports/trackback/

No comments yet.

RSS feed for comments on this post.

Leave a comment

Line and paragraph breaks automatic, e-mail address never displayed, HTML allowed: <a href="" title="" rel=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>

(required)

(required)


Protected by WP-Hashcash.

Powered by WordPress