ProjectLoad Blog

3/9/2006

Improving the Phase Editor

Filed under: — Jonny Roller @ 7:11 am

Based on customer feedback the phase editor has been redesigned to more closely resemble the project editor in appearance and functionality. Phases may have a different manager in charge of them than the project has. These “managed phases” are like sub projects and thus the manager of the phase needed the same capabilities as the project manager has over projects. The phase editor displays all sub phases and activities in a table (much like the project editor) and allows the phase manager to make the same kinds of changes for everything under his or her phase.

Comments »

The URI to TrackBack this entry is: http://blog.projectload.com/archives/2006/03/09/improving-the-phase-editor/trackback/

No comments yet.

RSS feed for comments on this post.

Leave a comment

Line and paragraph breaks automatic, e-mail address never displayed, HTML allowed: <a href="" title="" rel=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>

(required)

(required)


Protected by WP-Hashcash.

Powered by WordPress